In 2005 the KUMBA RESOURCES (now called EXXARO) started with the application of ZINGA on their infrastructures (6500 m² in total). Originally, they applied only one thin layer of ZINGA (because they had used too much solvent), which was not enough. After application of a new ZINGA layer in March 2006, the customer was very satisfied.

Gallery