This was a project for the Indonesian Navy.
They required a long-term, anti-corrosion protection with low maintenance cost, for 2,7 km of pipes which would carry diesel fuel.
A test application performed in 2013 (pictures below taken after 3 years) gave excellent
results which resulted in a project carried out from July till November 2016. They required almost 1 ton of ZINGA for this pipeline project.