World’s largest coal-fired power plant (8 x 1000 MW) located at south-eastern coast of Guangdong Province, China’s heavy duty
economic powerhouse. 4 equal phases scheduled to be built over 8 years, commencing June 2016, each of 2 x 1000 MW output and with state-of-theart technology for reduction of carbon emissions. Each phase requires 45,000 tons of structural steelworks. About 64% of the steel has been coated with ZINGA® as unique system @ 2 x 75 = 150 µm. The total ZINGA® consumption was about 321 tons. The smaller-sized steel members, or 16,200 tons in total, were
protected by HDG.