The Bremer River Rail Bridge spans the Bremer River between the towns of Ipswich and North Ipswich, Queensland, Australia. The Bridge was completed at the beginning of the 20th century and has a length of 380 meters. ZINGA has been included in the specifications from 2010 and has been applied in late 2011, early 2012. The customer was Queensland Rail (Regional Railway Company).
System:
Surface preparation: Power tools & Gritblasting to SA 2.5 degree (garnet)
ZINGA 2 x 60 μm DFT (by brush & airless spray)
Recent Comments