In January 2022 the Libyan ZINGA Distributor, ZINCCO Ltd., started the supply of a ZINGA Duplex System which was retained by AGOCO – Arabian Gulf Oil Company – for the protection of 22,000 m² of the external surfaces of the fire fighting pipeline system of their Tobruk Refinery.
The ZINGA System was applied by a qualified coating contractor, AL-BROUG OIL SERVICES Cy. In total 14 tons of ZINGA were used, 3500 Litres ZINGALUFER (PU) and 2900 Litres ZINGAFINISH (PU). The works were delivered in September 2022.