The new roof installed on the Athelstane Range Reservoir In Rockhampton, belonging to FITZROYWATER, required approx. 500 cleats to be welded to the existing HDG frame to support the new structure. ZINGA provided a method to enable equivalent protection to be applied in-situ. The whole project was entrusted to SWADLING PAINTS.
The project was completed in July 2024.
ZINGA has AS4020 approval for contact with potable water.
System:
Surface preparation: Bristle Blaster ZINGA 75 μm DFT (by brush)
Recent Comments