The AZEZA (Aqaba Special Economic Zone Authority) invested in a new photovoltaic plant near by the Amman Airport. The BELECTRIC GULF company, a subsidiary of BELECTRIC Solar & Battery Gmbh (Kolitzheim, Germany) obtained the order.
BELECTRIC GULF decided to protect the supporting beams of the solar panels with ZINGA, which were previously hot dip galvanized but already showing black spots and red rust.
The Jordan ZINGA Distributor, JORDAN UNITED FOR GENERAL SUPPLIES 0.U.G.S.) supplied the ZINGA . The works started in 2022 with the Main Contractor YELLOW DOOR ENERGY and the whole project was delivered in March 2023.
The whole plant has a capacity of 46 MWp and consists of 395,000 photovoltaic panels (the size of 400 football pitches).
System:
Surface preparation:
Mechanical tools ZINGA touch-up 30μm to 50μm DFT
Recent Comments