ZINGA has been specified by the Saline Water Conversion Co. (SWCC) to be applied on steel structures of the 380 KV electrical bridge at their Shoaiba desalination plant. It consists of 3 pylons (40 meter high) and 2 bridges between them (each 20 meter long). The total surface area was 3000 m². The surface was blasted using copper slag and ZINGA was applied by brush and roller up to 180 µm DFT in 2013 & 2014.

Gallery