In February 2002 ZINGA was applied on the passengers’ terminals of the Guangzhou New
Baiyun Airport. The construction of the passengers’ terminals consists of hollow metal elements, that have been previously hot-dip galvanised.

For better acoustics, the metal was perforated. Afterwards, the surface with the little holes had to be repaired again with ZINGA. The surface was sprayed with ZINGA in an angle of 45° from both sides.

Gallery