Project Description
The application took place in September and October of 2008. The investor for the renovation of the complete 500m long and 35m wide bridge was the General Directorate for National Roads and Motorways. The contractor was GS-STEEL from Gdansk. In total, 1.322 Kg of ZINGA were used to protect this magnificent bridge against corrosion.

The anti corrosion protection technology before renovation was:

Metallisation 120µm
Sealer, Intermediate coat and Topcoat; Total 200µm DFT
Surface preparation: Grit blasting

ZINGA 1 x 120µm DFT application by brush where the metallisation was removed (30% of the complete surface). Over the complete surface Sealer, Intermediate coat and Topcoat; Total 200µm DFT

 THE SIERHIERKOWSKI BRIDGE IN WARSAW
thumb-image-1516711365-23733
thumb-image-1516711350-23733
thumb-image-1516711335-23719
thumb-image-1516711323-23719
thumb-image-1516711154-23719
thumb-image-1516711306-23733
thumb-image-1516711287-23733
stripe

Contact Us

    Igoe International Ltd – ZINGA Distributors

    135 Slaney Road,
    Dublin Industrial Estate
    Glasnevin
    Dublin D11 AW6D
    Ireland

    Website www.zinga.ie

    See also www.igoe.ie

    01 830 22 50 / 830 22 49

    info@igoe.ie